An update on the Smyth Public Library, photos included

Dean Young has spearheaded reconstruction of the Smyth Public Library.  He has meticulously removed woodwork and replaced with passion and pride.  By doing that he saved $100,000 in reconstruction cost.  He reported that all we are waiting for is floors.  As soon as they are installed, shelving can start to be installed.  All the books that didn’t get damaged are in dry storage.  View the Photo History Gallery of the project.  Photos were taken the Monday after the library was damaged to present day.

- A message from Building Inspector, Kevin Gagne

Category: In the Vault | Source: Town Office | Status: Current

Sign Up for Candia Alerts

Receive emergency notifications instantly. Sign up for Candia Alerts now.

Candia Alerts

Contact Us

  Phone: 603-483-8101

  Email: info@candianh.org

  Town Directory

  Contact Form

PDF Reader

empty Some files on this site require a PDF reader. Download the latest Adobe Reader.

Sign In